Preparation of a Concept Design for Stage 2 of the Cronulla Town Centre Masterplan.
Works start date:
Jan 2019
Works end date:
Mar 2021
Public exhibition
Click here to navigate over to Join the Conversation.
Reason for works
The Cronulla Town Centre is a unique and iconic location, strongly valued by both the local community and visitors to the area. It has significant historic, recreation and community value, and coupled with the surrounding beaches, forms a strong part of our area’s cultural identity.
In 2015 the Plaza and surrounds were identified as being in need of a significant upgrade and an initial design competition explored the qualities that contributed to the Town Centre’s distinctive character and aspirations for the future.
This was followed by the development of a Cronulla Public Domain Design Strategy, and after extensive research, collaboration with urban design experts and consultation with community, the Cronulla Town Centre Public Domain Master Plan was prepared and adopted by Council in 2018.
With the Master Plan in place, staged delivery of works commenced in 2018 with the upgrade and modernisation of Stage 1 - Ocean Grove. To download a copy of the Masterplan click here.
Council has recently completed the Schematic Design Phase of Stage 2 of the project. This has been undertaken with the assistance of a Stakeholder Reference Group and input from local business owners. The design is based strongly on the endorsed Masterplan and consists of the main body of the Plaza between the Kingsway and Ocean Grove; the southern Kingsway footpath between Gerrale and Croydon Streets; and Croydon Lane.Stage 2 consists of the main body of the Plaza between the Kingsway and Ocean Grove; the southern Kingsway footpath between Gerrale and Croydon Streets; and Croydon Lane.
Scope of works
The scope of this project is to produce a concept design for the Plaza. Elements within this project, include:
- Investigation, research and analysis of existing conditions.
- Concept design for the Plaza from the Kingsway to Ocean Grove including seating, dining, lighting.
- Concept design the laneways connecting to the Plaza.
- Consultation through a Reference Group of concept design options.
- Direct engagement with Plaza business owners.
- Schematic design.
- Public Exhibition.
- Report to Council.
Project Schedule
Public impacts during construction
At this early stage, there may be investigation works for service location and geotechnical confirmation undertaken by specialist contractors.
Funding
This project is funded by Sutherland Shire Council from the Shopping Centres Upgrade Program.